March 2014

SPEAK YOUR MIND

slab prep

SLAB PREP

We are using 6″ of 60 and 40 PSI termite treated foam under the slab of our passive house with a 2″ rim to separate the slab from the walls.  This is a test piece we are using to level the site and shoot our lines.  We will do full slab prep monday if the weather holds.

 

Leave a Reply

Your email address will not be published. Required fields are marked *